API and EAC approved enterprise - Aipu Solids Control

Aipu Solids Control

Specializing in Drilling Mud Solids Control TechnologyA Technology-Oriented Manufacturer Integrating R&D, System Design, Process Engineering, and Sales

How to level your shale shaker before use

Release Date:2025-06-24 16:54:58

How to Level Your Shale Shaker Before Use

Proper leveling of a shale shaker is critical for optimal performance and longevity. An unleveled unit can lead to uneven screening, premature wear, and reduced efficiency in solids control. Here's a comprehensive guide to ensure your equipment operates at peak performance.

vibration screen

1. Site Preparation
Begin by selecting a stable, level surface for installation. Concrete pads or steel platforms are ideal. Avoid soft or uneven ground that may settle over time. Clear debris and ensure adequate space for maintenance access.

2. Equipment Inspection
Before positioning, inspect all components including the screen deck, vibration motors, and mounting hardware. Verify that no shipping blocks or transit restraints remain in place that could affect operation.

3. Initial Positioning
Place the shaker on the prepared surface using appropriate lifting equipment. Allow sufficient clearance around the unit - typically 1-1.5 meters on all sides for proper operation and maintenance access.

4. Leveling Procedure
Use a precision level with at least 0.5mm/m accuracy. Check levelness in both longitudinal and transverse directions:
- Place the level on the screen deck's structural frame
- Adjust the shaker's support legs or mounting points
- Verify level at multiple points across the deck

5. Final Verification
After initial leveling, run the shaker empty for 5-10 minutes. Recheck levelness as vibration may cause slight settling. Make final adjustments if necessary, ensuring all locking mechanisms are properly secured.

6. Operational Testing
Conduct a test run with actual drilling fluid. Observe material flow patterns across the screens - proper leveling should produce even distribution without pooling or dry spots.

Maintenance Considerations
Regularly check levelness during operation, especially after screen changes or maintenance. Environmental factors like temperature changes or ground settling may require periodic re-leveling.

If your project requires a mud shaker, choose Aipu Solids Control.

news

+86 29 6361 1979