1. Incorrect Foundation Preparation
One of the most frequent errors involves inadequate foundation preparation. Shale shakers require a level, stable surface with proper vibration isolation. Installing units on uneven floors or without proper mounting pads leads to excessive vibration transfer, affecting both performance and structural integrity.

2. Improper Screen Tensioning
Many operators fail to achieve the correct screen tension during installation. Both under-tensioned and over-tensioned screens cause problems - from premature screen failure to reduced solids separation efficiency. Following manufacturer specifications for tensioning procedures is essential.

3. Misaligned Feed Systems
Improper alignment between the flow line and shaker feed box creates uneven distribution of drilling fluid across the screens. This leads to localized overloading, reduced screen life, and compromised separation efficiency. The feed system should distribute fluid evenly across the entire screen width.

4. Inadequate Electrical Connections
Electrical issues frequently stem from incorrect voltage supply, improper grounding, or undersized wiring. These mistakes can cause motor overheating, inconsistent vibration patterns, and potential safety hazards. Always verify electrical requirements before installation.

5. Neglecting Proper Maintenance Access
Installing shale shakers without considering maintenance access is a common oversight. Operators should ensure sufficient clearance for screen changes, motor servicing, and routine inspections. Cramped installations lead to skipped maintenance and accelerated wear.

6. Incorrect Angle Adjustment
The deck angle significantly impacts separation efficiency. Many installations fail to properly adjust or lock the angle setting, resulting in either excessive fluid loss or poor solids removal. The optimal angle varies based on drilling conditions and should be periodically reviewed.

7. Overlooking Environmental Factors
Installation in areas with extreme temperatures, excessive dust, or corrosive atmospheres without proper protection shortens equipment life. Consider environmental conditions and implement appropriate safeguards during installation.